5 Critical Risks Every Project Owner Should Identify Before Breaking Ground
Construction projects are inherently risky, but the biggest risks aren't always the ones you'd expect. From scope gaps in contracts to unrealistic schedules, learn how to identify and mitigate the five most common risks before they become costly problems.
BLUF (Bottom Line Up Front)
Most owner cost overruns and disputes are not caused by "unforeseen conditions." They are the predictable result of five risks that were visible before construction began but were not actively identified, priced, or managed. Owners who address these risks early—before contracts are executed and schedules are locked—retain leverage, reduce downside exposure, and materially improve outcomes.
Construction projects are inherently risky, but the most damaging risks are rarely dramatic or unexpected. In practice, the problems that derail projects tend to be structural, contractual, and procedural—embedded quietly in documents, assumptions, and incentives long before the first shovel hits the ground.
Below are five critical risks that owners should identify and address before breaking ground. Each is common, preventable, and disproportionately expensive when ignored.
1. Scope Gaps Hidden in "Complete" Contract Documents
The risk:
Contracts appear comprehensive, yet critical work elements fall between drawings, specifications, and responsibility matrices. Everyone assumes someone else has included—or priced—the work.
Why it matters:
Scope gaps almost always become change orders. Because they surface after procurement, the owner typically pays:
- Premium pricing
- Schedule impacts
- Loss of negotiating leverage
Early warning signs:
- Vague phrases like "as required," "by others," or "coordinate with"
- No clear ownership of temporary works, access, staging, or protection
- Design intent shown without construction-level detail
Owner mitigation actions:
- Conduct a structured scope-gap review across drawings, specs, and contracts
- Force explicit responsibility assignments for "gray area" work
- Require bidders to acknowledge and price defined assumptions
2. Schedules Based on Optimism Instead of Production Reality
The risk:
Baseline schedules reflect best-case sequencing rather than realistic production rates, crew availability, or site constraints.
Why it matters:
An unrealistic schedule:
- Encourages bid underpricing
- Masks critical path fragility
- Sets the stage for acceleration claims later
Early warning signs:
- Aggressive durations unsupported by production data
- No allowance for weather, permitting, or cure times
- Logic that "looks right" but has no field validation
Owner mitigation actions:
- Independently validate production rates against comparable projects
- Stress-test the critical path, not just total duration
- Require schedule narratives explaining how work will actually be executed
3. Risk Allocation That Exists Only on Paper
The risk:
Contracts transfer risk to contractors that they cannot reasonably control or price.
Why it matters:
Risk does not disappear because it is assigned contractually. When misallocated, it resurfaces as:
- Claims
- Defensive behavior
- Quality and safety shortcuts
Early warning signs:
- Broad disclaimers without corresponding owner-provided data
- Differing site conditions clauses that are heavily constrained
- Performance obligations tied to owner-controlled inputs
Owner mitigation actions:
- Align risk allocation with actual control and information access
- Price retained risks intentionally rather than pretending they are transferred
- Avoid contract language that invites disputes instead of preventing them
4. Incomplete Owner Decisions at Time of Bid
The risk:
Key owner decisions—materials, phasing, access rules, operational constraints—are deferred until after award.
Why it matters:
Late decisions destroy pricing certainty. Contractors price assumptions, not intentions, and any deviation becomes compensable.
Early warning signs:
- Allowances used as placeholders for undefined scope
- "TBD" notes tied to major cost or schedule drivers
- Operational constraints still under discussion during procurement
Owner mitigation actions:
- Lock critical decisions before bid wherever possible
- If deferral is unavoidable, define pricing mechanisms in advance
- Maintain a clear decision log with cost and schedule implications
5. No Independent Reality Check on Cost and Constructability
The risk:
Owners rely solely on designer estimates or contractor pricing without an independent assessment focused on execution risk.
Why it matters:
Design-phase estimates often assume ideal conditions. Contractor bids reflect competitive pressure, not necessarily realism. Without a third perspective, optimism compounds.
Early warning signs:
- Estimates that reconcile mathematically but not operationally
- Minimal discussion of means and methods
- Contingency applied as a percentage without justification
Owner mitigation actions:
- Perform constructability reviews tied directly to cost and schedule
- Validate estimates using bottom-up logic, not just benchmarks
- Treat contingency as a risk register, not a rounding factor
Why Owners Pay for These Risks—Even When They "Did Everything Right"
A common theme runs through these failures:
Everyone followed the contract. Nobody owned the risk. The owner paid
anyway.
Legal enforceability does not guarantee operational success. Owners who rely exclusively on contract language without testing field reality often discover too late that the documents were internally consistent—but externally fragile.
The Owner's Advantage—If Used Early
Owners have maximum leverage before procurement and before notice to proceed. That is when risks are cheapest to address, easiest to clarify, and least likely to metastasize into disputes.
Identifying these five risks early does not eliminate uncertainty—but it converts surprise into managed exposure. That distinction is often the difference between a controlled project and a costly lesson.